Concrete Parts China Supplier Trailer Tube Secondary Constructional Column Pump

Concrete Parts China Supplier Trailer Tube Secondary Constructional Column Pump

Specification

  • use S-valve to change the path, for wonderful stone concrete conveying
  • excellent sealing S-valve, set up with floating wear resistant ring
  • Substantial-top quality use resistant alloy elements for prolonged support-existence
  • large shipping and delivery strain for desire of higher-rise and prolonged length projects
  • double-loop open up circuit hydraulic method, ensure rapidly route switching pace and substantial efficiency
  • air cooling method, without dependence of external drinking water provide
  • with re-pumping purpose to smooth design of greater accessibility
  • computerized lubrication technique for extended provider-daily life
  • PLC program to make certain greatest electrical control performance
  • geared up with wired distant controller, effortless to operate

concrete trailer pump is a set of mechanical, electrical and hydraulic engineering as 1, with dependable performance of sleek operation and strong pumping capability. Reliability and stability is confirmed by automatic motor regulation.
one) Convey floor heating lightweight foamed cement, mortar, fine mixture concrete.
2) Express all types of engineering design in the simple concrete, fiber concrete.
3) Conveying or injection of refractory and thermal insulation materials
4).Conveying or jet of greening soil on the building of ecological environment
5). Conveying or injection of basic concrete and fiber concrete for all sorts of engineering construction.

FAQ

  1. Are you manufacture?

Ans: Sure, we are factory with more than 10 a long time producing knowledge.

  1. What is the phrases of payment?

Ans: TT 30% deposit, TT 70% before shipping and delivery. We’ll share the photographs of the goods and packages together with bill and packing checklist.

  1. What is the phrases of shipping?

Ans:EXW, FOB, CFR,CIF

  1. How about the delivery time?

Ans: CZPTly it will take seven-ten functioning times soon after getting the progress payment. The certain supply time relies upon on the objects and the quantity of the order.

  1. What is the warranty of the equipment?

Ans: Our primary device enjoys one 12 months warranty, all equipment damaged can apply a new one particular in the course of this time, and we supply online video supporting set up ,procedure and routine maintenance.

  1. What is your packing like?

Ans: We use CZPT exporting wooden case for LCL and appropriate bundle for FCL.

  1. Will you check the products ahead of delivery?

Ans: Sure, we will test a hundred% prior to packing and will attach the test report alongside with goods.

  1. Do you desired offer wear components for transacted consumers?

Ans: Of course, get device from us, clientele can enjoy fifty% off to procure the use parts.

  1. Do you have any certificate for the equipment.

Ans: Indeed, all the device occur with ISO9001

 

Concrete Parts China Supplier Trailer Tube Secondary Constructional Column Pump

Tags:

Recent Posts