Liquid Mineral Pure Water Full Automatic Plastic Bottle Filling Plant

Liquid Mineral   Pure Water Full Automatic Plastic Bottle Filling Plant

Liquid CZPT / Pure H2o Complete CZPT CZPT CZPT Filling Plant

Product Description
CGF washing, filling ,capping 3 in 1 unit is a new sort gear, which base on years’ typical practice and undertake the innovative technology ,and absorb a lot of clients’ sights .
It satisfies the client’s necessity about filling various bottle measurement by means of 1 established. The suspension card bottleneck is adopted to make changing the bottle dimensions more handy.
It can deliver the bottles automatically by blind and then washing ,drying ,filling ,masking ,capping by order automatically.
It is extremely hard to go over lids when the bottles are ‘t up to the restricted degree, or will not arrive to the constrained feasible, or to adjust the pace freely, for it employs the advanced PLC technique and frequency conversion and velocity manage technique.

The operate of touching the display screen enables the operation easier and more rapidly. It is mostly utilised to non-carbonated beverage (pure drinking water and mineral h2o). CZPT CZPT Water Plant
1) The complete consuming drinking water plant has suspending bottle-neck clamping layout make the bottle steady during the higher-speed relocating conditions. By altering a few elements, it can meet up with the need of generation of different varieties of bottles effortlessly.
2) The new generation of stainless metal grab is adopted and the grabs have no get in touch with with the location earlier mentioned the bottle’s screw thread. Nozzles in the get can ensure the total clean of the inside of the bottle.
3) The advanced gravity filling technology utilised in this device tends to make the filling quick, steady and exact.
four) CZPTic torque is used for screw capping, and the energy of screw capping can be adjusted steplessly. Capping is trustworthy and do no harm to the caps.
5) CZPT systems, such as human-machine interface touch-display screen and PLC plan control are adopted in this mineral water plant device.
six) All parts that have direct contact with the water are created of high top quality stainless metal. The vital electrical parts are from CZPT international firms, this sort of as Mitsubishi, Omron to name a few.

Description
one.The pure h2o filling sealing machine is complete automated.It really is several benefits, this kind of as compact framework, excellent handle system and straightforward to be operated. CZPT touch screen and PLC manage technique can make gentleman-machine conversation real.
2.Washing portion in the pure water filling sealing equipment is mostly composed of washing pump, bottle clamps, h2o distributor, up switch-plate, information rail, safety include, spraying system, defrosting tray, rinse drinking water get and rinse drinking water refluxing tank.
3.Filling portion in the automated pure water filling sealing machine is composed of filling barrel, filling valves (standard temperature and regular strain filling), filling pump, bottle hanging gadget / bottle pedestals, elevating unit, liquid indicator, force gauge, vacuum pump, and so on.
4.Capping part in the computerized pure h2o filling sealing machine is mostly composed of capping heads, cap loader (divided), cap unscrambler, cap drop rail, pressure regulator, cylinder and also we want an CZPT as the auxiliary external products.

CZPT Information

Model CGF8-eight-3 CGF12-12-six CGF18-18-six CGF24-24-8 CGF32-32-eight CGF40-40-ten CGF50-fifty-twelve
Rinsing Head No eight twelve 18 24 32 40 50
Filling Head No 8 twelve 18 24 32 40 fifty
Capping Head No 3 6 six eight 8 twelve/10 twelve/10
RatedCapacity
(500ml)
2000BPH 4000BPH 7000-8000BPH 10000-12000BPH 12000-15000BPH 15000-18000BPH 20000-22000BPH
All round Dimensions 1900*fourteen
twenty*2000mm
2200*16
00*2300mm
2450*19
00*2300mm
2750*21
eighty*2400mm
4000*23
00*2300mm
4550*26
fifty*2300mm
5450*32
10*2300mm
Fat one.5T 2.2T 3.0T four.0T 8.0T 12.0T 20.0T
Electricity(KW) three.0kw 3.5kw 4.0kw 4.8kw seven.6kw eight.3Kw nine.6Kw
Rated Voltage 380V 380V 380V 380V 380V 380V 380V

Generation Flow 
PET CZPT Blowing CZPT(Make PET CZPTs)–>Water Treatment Method(purify raw water)–> CZPT Drinking water Filling CZPT(bottling h2o)–>Sleeve Labeling CZPT(labeled bottles)–>Code Printer(courting bottles)–>PE CZPT Wrapping CZPT(packing bottles)
Part 1: H2o Treatment method Program
Uncooked h2o Resource drinking water tank Supply drinking water pump Quartz sand filter Active CZPT filter PP sediment filter RO primary equipment Ozone sterilizer Pure water tank Filling System

Portion 2: H2o Filling CZPT
one.  The h2o filling machine is automatic. It really is of many benefits, this kind of as compact construction, best control program and simple to be operated. CZPT PLC contact screen and PLC manage system tends to make gentleman-device communication correct.
two. Washing element in the bottle drinking water machine is largely composed of washing pump, bottle clamps, drinking water distributor, up switch-plate, guide rail, safety cover, spraying system, defrosting tray, rinse h2o get and rinse drinking water refluxing tank.
3. Filling part in the drinking water filling machine  is composed of filling barrel, filling valves (standard temperature and standard pressure filling), filling pump, bottle hanging gadget / bottle pedestals, elevating device, liquid indicator, strain gauge, vacuum pump, and many others.
four. Capping part in this h2o filling machine is mainly composed of capping heads, cap loader (separated), cap unscrambler, cap fall rail, stress regular, cylinder and also we want an CZPT as the auxiliary external tools.
 

 

  one.All 304 stainless metal rinser heads, water spray style inject style, much more preserve h2o consumption & more clear
2.304 CZPT steel Gripper with plastic pad, make sure small bottle crash in the course of washing
3.304 stainless steel washing pump
  1.304 CZPT metal substantial precision filling nozzle
2.Filling quantity adjustable in good rank, identical liquid level following filling
3.All 304 stainless steel speak to components & liquid tank, fantastic polish, no death corner, effortless to cleanse
4.304 stainless metal filling pump
five.no bottle no filling
  1.Location & capping method, electromagnetic capping heads, with load discharge operate, make sure least bottle crash in the course of capping
two.All 304stainless metal building
3.No bottle no capping,
4.CZPT cease when deficiency of bottle

Part 3 : CZPT Shrink Sleeve Labeling CZPT
This equipment adopts worldwide superior technology to protect the circle label on the PET bottle. And then, very hot shrinking to repair on the placement which bottle human body specified.

Portion 4 : Date Printer
Variable figures/languages/logos/fonts printing 
Timing and counting printing 
Reversal and inverse etc, 4 directional inkjet printing 
CZPT demonstrate of goods counting, batch numbers, shift figures

Portion 5: PE CZPT Packing CZPT
The primary operate is wrapping the item by the shrink film initial, then heating it, in this way, the solution will be packed tightly by the movie. 

 
Inspections
We have our personal QC section in our manufacturing unit to make sure that all our goods are in really excellent high quality just before ship out to our customers.
 
Service
The Sample Service 
1.We can ship you the movie of the running device.
2.You are welcome to come to visit our business,and see the equipment running in our manufacturing facility,we can choose you up from the station near our city.
3.If we get the authorization of the client who has brought the devices from us ,we can inform you their contact details,you can go to visit their manufacturing unit.

CZPT Service 
one.We can style the machines in accordance your needs(materials,electricity,filling type,the types of the bottles,and so on),at the identical time we will give you our professional recommendation,as you know,we have been in this business for many several years.
2. We can provide some specialist recommendation when you start this venture, this sort of as attract the manufacturing facility layout for you,evaluate the source h2o report.

Right after-Revenue Support
1.We will give the invoice of load on time to make confident you can get the machine swiftly.
two.When you end the Planning circumstances ,our engineer will go to your manufacturing facility to set up the machine ,and give you the functioning guide ,and practice your staff until they can function the device nicely.
three.We request opinions from our buyer and offer you assist when the generation line have been utilized for some time! 
four.We offer 1 12 months guarantee with spare elements cost-free.

FAQ
Q1:Are you a trading firm or a manufactory ?
A1:We very own a factory ourselves, and we can guarantee the top quality we made.
 
Q2:What is your guarantee or the guarantee of the top quality if we purchase your devices?
A2:We offer you you high top quality equipment with higher high quality following-services. Also we have 1 yr guarantee of the spare parts, totally free of cost.
 
Q3:When can I get my device right after I paid?
A3:We will supply the devices on time as the date we agreed the two side.
 
This fall:How can I install my machine when it arrives?
A4:We will send our engineer to your side as quickly as you get all your machines prepared , for tests and instructing your professionals how to operate the equipment.
 
Q5:How about the spare elements?
A5:Right after we deal down all the items , we will provide you a spare elements record for your reference.

Purchasing Xihu (West Lake) Dis.s
Enquiry: Make contact with us by e mail, telephone call, fax, Instantaneous resources (CZPTmanager, MSN, Skype) and permit us know your enquiry.
Discussion: Specify the items you wish, validate specification OEM/ODM session.
Quotation: Charges provided and acknowledged.
Putting Order: Spot get as for every agreement or discussion.
Double validate: Proforma invoice presented to double affirm the buy for each-side information.
Payment: Payment settled.
Making CZPT: Make equipment as for every contracted term   under our arrangement.
CZPT: Items delivered as for each contracted term.
Arrival:Merchandise get there at nearby port or warehouse, depending on contracted term.  
CZPTness: Purchase concluded. 
 
This is Dina, who will consider my ideal to provide far better provider for you .
If you have any need or question , tell me freely and I will reply to you as soon as attainable!
TEL:-51258550068 (Plz get in touch with me !!)  FAX:-5125855571
Cell: -18551189318 (24hour on-line)
 

 
 

Liquid Mineral   Pure Water Full Automatic Plastic Bottle Filling Plant

Tags:

Recent Posts